Modolith played a critical role in the WWTP Improvements project in Olive Branch, MS, by erecting four specialized pre-engineered metal building (PEMB) structures to support enhanced water treatment operations. Designed for durability and functionality, these structures included a state-of-the-art laboratory, a lime feeder facility, and two large-span tank covers—each engineered to optimize performance at the wastewater treatment plant.